Floating Dock CraneDock ArmShip Building Gantry CraneShipyard Jib CraneMobile Boat HoistBoat Jib CraneContainer CraneFixed Portal Jib Crane
EOT- Overhead CraneGantry CraneRubber Tyred Gantry CraneJib CraneHoistCrane Parts
Portal CraneSpreader & Grab
Warranty PolicyInstallation ServicesSpares & AccessoriesUrgent ServiceProject ServicesDownload CenterPartner Cooperation
Inquire
About STONIMAGETypical Project ReportCompany CultureR&DMade in China
Home / About Us / Typical Project Report / Cranes Installation Report on an Old Floating Dock

Cranes Updrading Report on an Old Floating Dock in 2015

- How to updrage your cranes on an old floating dock?

 

 

1. Taking a shipyard in the Middle East as an example, the shipyard have a 15000 ton floating dock, under upgrading

 

2. Location: one shipyard in Middle East

 

3. Crane Upgrading Report at 2015 -  Index as below

3.1 Relationship analyse between the upgrading plan of the floating dock and the crane
3.2 Research on the manufacturing drawings of the floating dock (the parts related to cranes, such as Runway beam, Rail etc.)
3.3 Remove of old cranes and old rails
3.4 Alignment, installation and safety considerations for the new new
3.5 Preparation of crane installation equipment (eg personnel, truck cranes, floating cranes, forklifts, etc.)
3.6 Crane installation

3.7 Crane commissioning
3.8 Installation and use of the windproof device, anti-overturning device and shelving frame of the crane
3.9 Functional test and Load test
3.10 Third Party Acceptance
3.11 Course training and trial operation

3.12 About Classification Society

 

For report details, pls contact with us for PDF file download.

 

 



Inquire


Phone

+86 373 5853611


Whatsapp

8615137380574


WeChat

+86 15137380574


Email

info@stonimage.com.cn