Title: Cranes Updrading Report on an Old Floating Dock in 2015
1. Taking a shipyard in the Middle East as an example, the shipyard have a 15000 ton floating dock, under updrain
2. Location: one shipyard in Middle East
3. Crane Upgrading Report at 2015 - Index as below
3.1 The relationship between the upgrading plan of the floating dock and the crane
3.2 Research on the manufacturing drawings of the floating dock (the parts related to cranes, such as Runway beam, Rail etc.)
3.3 Demolition of old cranes and old rails
3.4 Mapping, installation and safety considerations for the new track
3.5 Preparation of crane installation equipment (eg personnel, truck cranes, floating cranes, forklifts, etc.)
3.6 Crane installation
3.7 Installation and use of the windproof device, anti-overturning device and shelving frame of the crane
3.8 Load test,
3.9 Third Party Acceptance
3.10 Course training and trial operation
For report details, pls contact with us for PDF file download.