Cranes Updrading Report on an Old Floating Dock in 2015
- How to updrage your cranes on an old floating dock?
1. Taking a shipyard in the Middle East as an example, the shipyard have a 15000 ton floating dock, under upgrading
2. Location: one shipyard in Middle East
3. Crane Upgrading Report at 2015 - Index as below
3.1 Relationship analyse between the upgrading plan of the floating dock and the crane
3.2 Research on the manufacturing drawings of the floating dock (the parts related to cranes, such as Runway beam, Rail etc.)
3.3 Remove of old cranes and old rails
3.4 Alignment, installation and safety considerations for the new new
3.5 Preparation of crane installation equipment (eg personnel, truck cranes, floating cranes, forklifts, etc.)
3.6 Crane installation
3.7 Crane commissioning
3.8 Installation and use of the windproof device, anti-overturning device and shelving frame of the crane
3.9 Functional test and Load test
3.10 Third Party Acceptance
3.11 Course training and trial operation
3.12 About Classification Society
For report details, pls contact with us for PDF file download.